This report develops a range of green infrastructure scenarios consistent with the constraints of a recently remediated brownfield that can be implemented within the framework of a 15- to 20-year development master plan. There are collections and descriptions of key findings during the exploration of this topic that can be applied to the Zidell site and other redevelopment projects of similar character. The conceptual design scenarios apply green infrastructure solutions that capitalize on infiltration and innovation for the remediated brownfield site with the goal of exceeding existing regulatory requirements for stormwater management and providing creative solutions with multiple community benefits.
Access ResourceDistrict Scale Green Infrastructure Scenarios for the Zidell Development Site, City of Portland
Resource Name: An Exploration of Holistic, Adaptive, and Flexible Green Infrastructure Strategies within a 33-acre Remediated Brownfield Development
Category: Examples
Region: Cascadia
Year: 2014
Source: US EPA -- Bureau of Environmental Services, Portland, OR